Baola Field
Existing Asset Overview : Baola field in Gujarat, India
  • Field Discovery in 1971
  • Discovery well Baola 1
  • Area 4 Sq. Km.
  • Depth of Top of Reservoir 880 metres
  • No. of wells 2 (Baola 1 & 5)
  • Baola 1 tested gas @ 36225Cu.m/d (6mm bin)
  • Baola 5 tested gas @32130Cu.m/d (6mm bin)
  • PSC signed on 5th April 1995
  • Mining Lease granted in March 2001
  • Gas Supply from Baola 1 @12000 Cu.m/d from June 2001 to June 2004
  • Supply stopped due to water ingress


Existing Asset Overview : Baola field
Action Plan :

Reprocess Existing Seismic data & well date to
determine possibility of well intervention
Acquistion, processing and Interpretation of 2D
(infill)/3D Seismic data
Drill a new well and start production of gas fpr supply